UNILEVER WASTEWATER TREATMENT PLANT UPGRADES
HENDERSON | NV
UNILEVER WASTEWATER TREATMENT PLANT UPGRADES
DETAILS
YEAR COMPLETED
2008
CONTRACT AMOUNT
$2,800,000
OWNER
MWH Americas, Inc..

PROJECT RELEVANCE

The project was for the pretreatment of plant waste, prior to it entering the city’s sanitary sewer system.
The work required the construction of a new 30 foot diameter clarifier concrete reinforced structure and a
2.5 gallon reinforced concrete partially buried aeration basin structure.
The project included excavating over 15,000 cubic yards for the new structures and forming and placing
over 2,100 cys of structural reinforced concrete. GSE utilized a combination of sheet piles for the
protection of existing structures. Site work piping included the new buried supply and return lines from
the clarifier and aeration basin. The mechanical work included installing a new clarifier mechanism and the
new floating aeration equipment. Electrical and instrumentation upgrades were required for the operation
of the new equipment. Project closeout included some minor site concrete pads and some asphalt
concrete patch paving.