   Title Water Reclamation Plt 5 - PHI Dewatering FacilityBid Opening Date 01/19/2010 2:00pm   
Construction Bid Opportunities  
Title Water Reclamation Plt 5 - PHI Dewatering Facility
Bid Walk 01/06/2010 10:00am
  see photos
Bid Opening Date 01/19/2010 2:00pm
Estimated Cost $3 to $4 Million
Description The project consists of construction facilities to dewater digested sludge produced at the WRP. Facilities included a pre-engineered buildings to house District furnished centrifuges; sludge pumps; screw conveyors; polymer storage tanks and polymer mixing and feeding equipment; above and below ground piping and drain lines, MCC’s and associated electrical equipment; and all other ancillary equipment work.
Construction Documents Plans :
pdf file Lan G Drwgs.pdf
pdf file Lan C Drwgs.pdf
pdf file Lan A Drwgs.pdf
pdf file Lan S Drwgs.pdf
pdf file Lan M Drwgs.pdf
pdf file Lan E Drwgs.pdf
pdf file Lan I Drwgs.pdf
  Specs :
pdf file Lan TC and Sec 01.pdf
pdf file Lan Sec 02.pdf
pdf file Lan Sec 03.pdf
pdf file Lan Sec 05.pdf
pdf file Lan Sec 07.pdf
pdf file Lan Sec 08.pdf
pdf file Lan Sec 09.pdf
pdf file Lan Sec 10.pdf
pdf file Lan Sec 11.pdf
pdf file Lan Sec 13.pdf
pdf file Lan Sec 14.pdf
pdf file Lan Sec 15.pdf
pdf file Lan Sec 16.pdf
pdf file Lan Sec 17.pdf
pdf file Lan Sec 18.pdf
  Add.s & Upd. :
pdf file Lan Addendum 02.pdf
pdf file Lan Addendum 01.pdf
pdf file Lan Addendum 01 Drwgs.pdf
  Photos: