| Description |
The project consists of furnishing and installing all mechanical, structural, civil, architectural, electrical, instrumentation, and other items necessary including site improvement and utility piping to construct the Main Drain Pump Station, including two 144 cfs vertical wet pit pumps, two diesel fuel engines, right angle gears, fuel oil storage tank, pump building, pump discharge steel pipes, pump station forebay, wet well, discharge outfall structure, demolition of existing pump station and associated structural, equipment, piping, paving, repair and reconstruction of existing improvements affected by the Work, provide temporary pumping system during the construction and all incidentals for a complete and usable facility. |