| Description |
The project is located at the following three locations: Rio Vista Intake PS: At this location, the project includes but is not limited demo items; removal of a U/G fuel tank, pump and pipes; landscaping restoration; modify existing manholes, pipes and HVAC; install a new aboveground fuel tank, raw water pumps, pipes, and gen-set; electrical and instrumentation as well as all associated work as per the contract documents. Rio Vista WTP: At this location, the project includes but is not limited demo items; Remove plant water and sludge pump stations; modify plant and pipe gallery piping, pre-ozone contactor, washwater recovery basin, chemical storage and feed systems, and ozone generation system; construction of an ozone pipeline contactor, ozone injection station with off-gas collection and treatment, six clarifiers, six filters, pipe gallery, washwater recovery basin, washwater return pump, sludge thickener tank and pump station, chlorine storage and feed building, plant water pump station; electrical and instrumentation as well as all associated work as per the contract documents. CLWA Valve Vault #2: The project includes but is not limited to modifications to the PLC Panel. |